- Estimation enhancement (David H/Jeff)
- Dependency lock update (Sijia)
- Admin update (Joe)
- ActivitySim at MoMo'25
- Estimation mode was slow and cumbersome, needed to rerun ActivitySim multiple times
- Task 1 Estimation Runtime Performance
- Task 2 Estimation Usability Improvements
- Run Multiprocessing in estimation mode, and change format of estimation data bundles (EDB)
- Built into the CI test to ensure EDB consistency -- new format
- Allows for destination choice alt sampling in estimation mode (not previously allowed)
- includes chosen alt
- 1-zone and 2-zone (TAZ+MAZ) versions
- Changed data frame to ID-CASE, ID-ALT format (preferred for LARCH)
- EDB size drastically reduced
- Tested on Prototype MTC model with synthetic data
- convert from CSV to Parquet format made huge improvements in read/write time, output size
- Tested on SANDAG model with real data
- took advantage of LARCH functionality, e.g., modify specs in LARCH without going into ActivitySim; LARCH "doctor" data cleaning utility
- Jeff added LARCH enhancements for prediction and troubleshooting functionality
- ActivitySim Users Guide updated for Estimation Mode.
- Call for either Sijia or CS to review
- Recommended 3 options: Pip, PDM, UV
- Conducting tests
- UV testing -- winner on user experience; problems with SANDAG example (indexing issues) being investigated
- PDM not as smooth and slower
- PIP abandoned due to lack of native lock file support, slow
- Team will finish testing and create a PR
- Will prepare a final wrap up presentation
- Several presentations using ActivitySim or related
- AMPO to Zephyr transition underway
- In reviewing invoices, there may be some remaining balances from Phase 9 that are not 100% drawn down.
- Important because of transfer of funds from AMPO to Zephyr
- RSG, WSP, CS should review before end of June and let Joe and Alex B know
- Moving partners-only meeting to June 12; need to squeeze in Roadmap discussion before end of June!