Skip to content

Passing Time_Interval as a non-2D-vector in the example scripts #1

@sh-cau

Description

@sh-cau

In the MATLODE_Example_ERK_ADJ_Integrator script, if you change
Time_Interval = [0 20]
to, e.g.,
Time_Interval = [0 10 20]
an error is thrown. I think this is because of
OPTIONS.Quadrature = Quadrature;
in MATLODE_ERK_ADJ_Integrator in line 171 (and possibly others). There, the function handle is overwritten with the numeric integration value after the first for-loop execution. I am not sure how to fix this appropriately.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions