fix: Resolve precision loss in AccountsAPI balance conversion causing zero balances #22152
main.yml
on: pull_request
Check workflows
5s
Matrix: Lint, build, and test / Prepare
Matrix: Lint, build, and test / Build
Matrix: Lint, build, and test / Lint
Matrix: Lint, build, and test / Test
Matrix: Lint, build, and test / Validate changelog
Determine whether this is a release merge commit
0s
All jobs pass
3s
Create update issues
/
create-update-issues
Annotations
24 errors and 1 warning
Lint, build, and test / Test (22.x, @metamask/transaction-controller)
The operation was canceled.
|
Lint, build, and test / Test (22.x, @metamask/transaction-controller)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Code scanner / Run security scan
The operation was canceled.
|
Code scanner / Run security scan
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Lint (22.x)
The operation was canceled.
|
Lint, build, and test / Lint (22.x)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Test (18.x, @metamask/network-controller)
The operation was canceled.
|
Lint, build, and test / Test (18.x, @metamask/network-controller)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Test (22.x, @metamask/assets-controllers)
The operation was canceled.
|
Lint, build, and test / Test (22.x, @metamask/assets-controllers)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Test (20.x, @metamask/network-controller)
The operation was canceled.
|
Lint, build, and test / Test (20.x, @metamask/network-controller)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Test (22.x, @metamask/network-controller)
The operation was canceled.
|
Lint, build, and test / Test (22.x, @metamask/network-controller)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Test (18.x, @metamask/assets-controllers)
The operation was canceled.
|
Lint, build, and test / Test (18.x, @metamask/assets-controllers)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Build (22.x)
The operation was canceled.
|
Lint, build, and test / Build (22.x)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Lint, build, and test / Test (20.x, @metamask/assets-controllers)
The operation was canceled.
|
Lint, build, and test / Test (20.x, @metamask/assets-controllers)
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
All jobs pass
Process completed with exit code 1.
|
Main
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Main
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Main
Canceling since a higher priority waiting request for Main-refs/pull/6330/merge exists
|
Code scanner / Run security scan
Unable to validate code scanning workflow: error: getWorkflow() failed: Error: Expected to find a code scanning workflow file at /home/runner/work/core/core/.github/workflows/main.yml, but no such file existed. This can happen if the currently running workflow checks out a branch that doesn't contain the corresponding workflow file.
|