Skip to content

small refactor and clean up #1928

small refactor and clean up

small refactor and clean up #1928

Triggered via push April 16, 2025 09:57
Status Failure
Total duration 1m 29s
Artifacts

unittests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors
build (ubuntu-latest, 3.11)
Process completed with exit code 1.
build (ubuntu-latest, 3.10)
Process completed with exit code 1.
build (ubuntu-latest, 3.10)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
build (ubuntu-latest, 3.12)
The operation was canceled.
build (ubuntu-latest, 3.12)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
build (windows-latest, 3.11)
The operation was canceled.
build (windows-latest, 3.11)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
build (ubuntu-latest, 3.9)
The operation was canceled.
build (ubuntu-latest, 3.9)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed
build (ubuntu-latest, 3.8)
The operation was canceled.
build (ubuntu-latest, 3.8)
The strategy configuration was canceled because "build.ubuntu-latest_3_11" failed