Milestones

List view

  • A way for users to test the platform on their data without needing to configure all features before getting started. Connect our existing modules, set good defaults allow them to start with images. Create a hidden draft/scratch project for each user, possibility in a dedicated environment. Additional specifications are in this document and in the tickets for this milestone: https://docs.google.com/document/d/16rUD0RWuXRUMgy5SuYIBZgpTvNmb2n-ad5Shjd3uY4E/edit?tab=t.7cy6ie6tscvx

    Overdue by 1 day(s)
    Due by October 4, 2025
    8/10 issues closed
  • No due date
    5/13 issues closed
  • Create an accessible set of instructions for users of the platform. Include both a full documentation (for example, using mkdocs) and for tooltip hints/buttons on the platform

    Due by December 20, 2025
    1/2 issues closed
  • Work to choose and integrate the development work that was done for the Panama field trip, back into the Main Antenna branch

    Overdue by 1 month(s)
    Due by September 1, 2025
    0/3 issues closed
  • This milestone is only to hold leftover issues from milestones that should be closed, and older ones that haven't been updated in a long while. All issues in this milestone should be transferred to more appropriate milestones.

    No due date
    2/14 issues closed
  • Issues related to developing a dedicated pipeline for forest pest insects across Canada

    Due by December 20, 2025
    2/5 issues closed
  • General Milestone for ML features

    No due date
    1/15 issues closed
  • Investigate and implement new tools, schemas and technologies like PySpark, Elasticsearch, Weaver, Kavi's implementation or other tools with similar aims. These issues usually targets components outside of Antenna's source code

    No due date
    0/3 issues closed
  • Objective is streamlined user experience, easy to demo the platform without guidance. The users need to be able to do the following without intervention from the dev team: - Create an account - Log in - Create a project - Upload data - Review imported data - Run the uploaded data through the pipeline - Browse/Explore data - Validate data - General data visualisation from project - Download data

    Due by December 20, 2025
    10/55 issues closed
  • Catch all milestone for non-urgent work items

    No due date
    9/69 issues closed