Skip to content

FED-4060 Set up gha-dart-oss #3

FED-4060 Set up gha-dart-oss

FED-4060 Set up gha-dart-oss #3

Triggered via pull request August 7, 2025 22:18
Status Failure
Total duration 3m 59s
Artifacts 1

ci.yml

on: pull_request
Matrix: checks
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

6 errors
checks (stable) / analyze
Process completed with exit code 3.
checks (2.19.6) / format
The operation was canceled.
checks (2.19.6) / format
The strategy configuration was canceled because "checks.stable" failed
checks (2.19.6) / analyze
The operation was canceled.
checks (2.19.6) / analyze
The strategy configuration was canceled because "checks.stable" failed
CI
The strategy configuration was canceled because "checks.stable" failed

Artifacts

Produced during runtime
Name Size Digest
react-dart-sbom.cyclonedx.json Expired
14.9 KB
sha256:0be9ca6a7ee30d23b096b62a40e8bbf0374b7f4360a283b396171658903448bf