Add the unit tests #100
tests.yaml
on: pull_request
Matrix: behave
Matrix: unit
pyright
36s
Test compatibility with the latest version of ydiff
29s
docs
2m 58s
isort
25s
Finalize Codacy
0s
Finalize coveralls.io
0s
Annotations
11 errors
|
isort
Process completed with exit code 1.
|
|
isort:
tests/test_multisite.py#L0
Imports are incorrectly sorted and/or formatted.
|
|
behave (ubuntu, 3.13, etcd)
Process completed with exit code 1.
|
|
behave (macos, 3.8, raft)
[notice] A new release of pip is available: 21.1.1 -> 25.0.1
[notice] To update, run: python3.8 -m pip install --upgrade pip
|
|
unit (windows)
The operation was canceled.
|
|
unit (windows)
The job has exceeded the maximum execution time of 6h0m0s
|
|
unit (ubuntu)
The operation was canceled.
|
|
unit (ubuntu)
The job has exceeded the maximum execution time of 6h0m0s
|
|
unit (macos)
The operation was canceled.
|
|
unit (macos)
[notice] A new release of pip is available: 21.1.1 -> 25.0.1
[notice] To update, run: python3.8 -m pip install --upgrade pip
|
|
unit (macos)
The job has exceeded the maximum execution time of 6h0m0s
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
behave-ubuntu-etcd-3.13-logs
Expired
|
27.9 KB |
sha256:a01d2d5c9cf5db4e29084e741495c35b6a9589c63f3d0651d590de9ed12d0cf3
|
|