Bump the jest group with 2 updates (#1808) #257
cd.yml
on: push
Matrix: 🤖 CI / tests de bout-en-bout
🔢 Release
🟠 Airflow
/
...
/
Clever Cloud
🟠 Airflow
/
...
/
Clever Cloud
🔢 Release
0s
Annotations
10 errors
🤖 CI / tests frontend
Process completed with exit code 1.
|
🤖 CI / tests de bout-en-bout (2/5)
Process completed with exit code 1.
|
🤖 CI / tests de bout-en-bout (5/5)
Process completed with exit code 1.
|
🤖 CI / tests de bout-en-bout (5/5)
The strategy configuration was canceled because "ci.e2e._2_5" failed
|
🤖 CI / tests de bout-en-bout (3/5)
The operation was canceled.
|
🤖 CI / tests de bout-en-bout (3/5)
The strategy configuration was canceled because "ci.e2e._2_5" failed
|
🤖 CI / tests de bout-en-bout (4/5)
The operation was canceled.
|
🤖 CI / tests de bout-en-bout (4/5)
The strategy configuration was canceled because "ci.e2e._2_5" failed
|
🤖 CI / tests de bout-en-bout (1/5)
The operation was canceled.
|
🤖 CI / tests de bout-en-bout (1/5)
The strategy configuration was canceled because "ci.e2e._2_5" failed
|