Skip to content

Conversation

@rgiulietti
Copy link
Contributor

@rgiulietti rgiulietti commented Oct 24, 2025

The reason for this last minute renaming is to more closely adhere to the IEEE 754 nomenclature, even in the BigInteger class (and in the internal MutableBigInteger).


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • Commit message must refer to an issue
  • Change requires CSR request JDK-8370629 to be approved

Issues

  • JDK-8370628: Rename BigInteger::nthRoot to rootn, and similarly for nthRootAndRemainder (Enhancement - P4)
  • JDK-8370629: Rename BigInteger::nthRoot to rootn, and similarly for nthRootAndRemainder (CSR)

Reviewers

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk.git pull/27980/head:pull/27980
$ git checkout pull/27980

Update a local copy of the PR:
$ git checkout pull/27980
$ git pull https://git.openjdk.org/jdk.git pull/27980/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 27980

View PR using the GUI difftool:
$ git pr show -t 27980

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk/pull/27980.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Oct 24, 2025

👋 Welcome back rgiulietti! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Oct 24, 2025

@rgiulietti This change now passes all automated pre-integration checks.

ℹ️ This project also has non-automated pre-integration requirements. Please see the file CONTRIBUTING.md for details.

After integration, the commit message for the final commit will be:

8370628: Rename BigInteger::nthRoot to rootn, and similarly for nthRootAndRemainder

Reviewed-by: darcy

You can use pull request commands such as /summary, /contributor and /issue to adjust it as needed.

At the time when this comment was updated there had been 6 new commits pushed to the master branch:

As there are no conflicts, your changes will automatically be rebased on top of these commits when integrating. If you prefer to avoid this automatic rebasing, please check the documentation for the /integrate command for further details.

➡️ To integrate this PR with the above commit message to the master branch, type /integrate in a new comment.

@openjdk openjdk bot added csr Pull request needs approved CSR before integration core-libs core-libs-dev@openjdk.org labels Oct 24, 2025
@openjdk
Copy link

openjdk bot commented Oct 24, 2025

@rgiulietti The following label will be automatically applied to this pull request:

  • core-libs

When this pull request is ready to be reviewed, an "RFR" email will be sent to the corresponding mailing list. If you would like to change these labels, use the /label pull request command.

@openjdk openjdk bot added the rfr Pull request is ready for review label Oct 24, 2025
@mlbridge
Copy link

mlbridge bot commented Oct 24, 2025

Webrevs

@openjdk openjdk bot added ready Pull request is ready to be integrated and removed csr Pull request needs approved CSR before integration labels Oct 24, 2025
@openjdk openjdk bot removed the ready Pull request is ready to be integrated label Oct 25, 2025
@rgiulietti rgiulietti requested a review from jddarcy October 25, 2025 10:57
@openjdk openjdk bot added the ready Pull request is ready to be integrated label Oct 25, 2025
@rgiulietti
Copy link
Contributor Author

/integrate

@openjdk
Copy link

openjdk bot commented Oct 27, 2025

Going to push as commit e9479b5.
Since your change was applied there have been 10 commits pushed to the master branch:

Your commit was automatically rebased without conflicts.

@openjdk openjdk bot added the integrated Pull request has been integrated label Oct 27, 2025
@openjdk openjdk bot closed this Oct 27, 2025
@openjdk openjdk bot removed ready Pull request is ready to be integrated rfr Pull request is ready for review labels Oct 27, 2025
@openjdk
Copy link

openjdk bot commented Oct 27, 2025

@rgiulietti Pushed as commit e9479b5.

💡 You may see a message that your pull request was closed with unmerged commits. This can be safely ignored.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

core-libs core-libs-dev@openjdk.org integrated Pull request has been integrated

Development

Successfully merging this pull request may close these issues.

2 participants