Skip to content

refactor

refactor #104

Triggered via push August 24, 2025 04:59
Status Failure
Total duration 41s
Artifacts

pylint.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.10)
Process completed with exit code 30.
build (3.11)
Process completed with exit code 30.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.9)
Process completed with exit code 30.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_10" failed