Skip to content

chore(deps): lock file maintenance #3392

chore(deps): lock file maintenance

chore(deps): lock file maintenance #3392

Triggered via pull request October 6, 2025 12:46
Status Failure
Total duration 1m 20s
Artifacts

test.yml

on: pull_request
Matrix: test_matrix
Fit to window
Zoom out
Zoom in

Annotations

18 errors
test_matrix (21, ubuntu-latest)
Process completed with exit code 1.
test_matrix (20, macos-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (20, ubuntu-latest)
The operation was canceled.
test_matrix (20, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (20.8.1, ubuntu-latest)
Process completed with exit code 1.
test_matrix (20.8.1, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (20, windows-latest)
The operation was canceled.
test_matrix (20, windows-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (21, macos-latest)
The operation was canceled.
test_matrix (21, macos-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (21, windows-latest)
The operation was canceled.
test_matrix (21, windows-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (20.8.1, macos-latest)
The operation was canceled.
test_matrix (20.8.1, macos-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_matrix (20.8.1, windows-latest)
The operation was canceled.
test_matrix (20.8.1, windows-latest)
The strategy configuration was canceled because "test_matrix._21_ubuntu-latest" failed
test_dev
Process completed with exit code 1.
test
Process completed with exit code 1.