Skip to content

chore(deps): lock file maintenance #3400

chore(deps): lock file maintenance

chore(deps): lock file maintenance #3400

Triggered via push October 14, 2025 08:48
Status Failure
Total duration 42s
Artifacts

test.yml

on: push
Matrix: test_matrix
Fit to window
Zoom out
Zoom in

Annotations

19 errors
test_matrix (20, macos-latest)
Process completed with exit code 1.
test_matrix (20.8.1, ubuntu-latest)
The operation was canceled.
test_matrix (20.8.1, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (20, ubuntu-latest)
The operation was canceled.
test_matrix (20, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (21, macos-latest)
The operation was canceled.
test_matrix (21, macos-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (21, ubuntu-latest)
The operation was canceled.
test_matrix (21, ubuntu-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (20.8.1, windows-latest)
The operation was canceled.
test_matrix (20.8.1, windows-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (21, windows-latest)
The operation was canceled.
test_matrix (21, windows-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (20.8.1, macos-latest)
The operation was canceled.
test_matrix (20.8.1, macos-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_matrix (20, windows-latest)
The operation was canceled.
test_matrix (20, windows-latest)
The strategy configuration was canceled because "test_matrix._20_macos-latest" failed
test_dev
Process completed with exit code 1.
test
Process completed with exit code 1.