Skip to content

Bump ts-jest from 29.1.2 to 29.4.2 #1593

Bump ts-jest from 29.1.2 to 29.4.2

Bump ts-jest from 29.1.2 to 29.4.2 #1593

Triggered via pull request September 16, 2025 04:05
Status Failure
Total duration 26s
Artifacts

ci.yml

on: pull_request
Unit tests
16s
Unit tests
Matrix: integration-test
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 notice
Integrate Swift 6.1.0 on ubuntu-latest
Unexpected error, unable to continue. Please report at https://github.com/swift-actions/setup-swift/issues The process '/usr/bin/gpg' failed with exit code 2 Stacktrace: Error: The process '/usr/bin/gpg' failed with exit code 2 at ExecState._setResult (/home/runner/work/setup-swift/setup-swift/node_modules/@actions/exec/lib/toolrunner.js:592:1) at ExecState.CheckComplete (/home/runner/work/setup-swift/setup-swift/node_modules/@actions/exec/lib/toolrunner.js:575:1) at ChildProcess.<anonymous> (/home/runner/work/setup-swift/setup-swift/node_modules/@actions/exec/lib/toolrunner.js:469:1) at ChildProcess.emit (node:events:524:28) at maybeClose (node:internal/child_process:1104:16) at Process.ChildProcess._handle.onexit (node:internal/child_process:304:5)
Integrate Swift 6.1.0 on macos-latest
The operation was canceled.
Integrate Swift 6.1.0 on macos-latest
The strategy configuration was canceled because "integration-test.ubuntu-latest_6_1_0" failed
Integrate Swift 5.6.3 on windows-latest
The operation was canceled.
Integrate Swift 5.6.3 on windows-latest
The strategy configuration was canceled because "integration-test.ubuntu-latest_6_1_0" failed
Integrate Swift 5.6.3 on windows-latest
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677