chore(deps-dev): bump vite from 5.4.11 to 7.0.0 #1035
ci.yml
on: pull_request
lint
26s
playwright-tests
55s
Matrix: jest-tests
Annotations
5 errors
jest-tests (22, ubuntu-latest)
Process completed with exit code 1.
|
jest-tests (18, ubuntu-latest)
The operation was canceled.
|
jest-tests (18, ubuntu-latest)
The strategy configuration was canceled because "jest-tests._22_ubuntu-latest" failed
|
jest-tests (20, ubuntu-latest)
The operation was canceled.
|
jest-tests (20, ubuntu-latest)
The strategy configuration was canceled because "jest-tests._22_ubuntu-latest" failed
|