  • Prototype 5 will replace NEMS with CMEPS and CICE5 with CICE6. It will also use the fractional grid capability. These are the minimum requirements Also desired are to solve the restart b4b capability. Note, doing that will also probably require WW3 coming in via the mediator. If these cannot be solved by the time we are ready to start Prototype 5 then we will move these requirements to Prototype 6.

    No due date
  • To run a benchmark with coupled FV3-MOM6-CICE5-WW3 using CCPP (need to confirm physics suite). Essentially the same suite used by GEFS v12, without stochastic physics and no NSST. This will have two way wave - atmoshpere coupling as well as wave - ocean coupling through connectors

    Overdue by 5 year(s)
    Due by May 31, 2020
    12/12 issues closed